Suction pile installation and removal on Seagreen windfarm
Year: 2019 (Feb to May) Location: UK Activity: Transport and Installation |
Scope
Design engineering and fabrication of a trial suction pile for the Seagreen windfarm project. Marine Masters was hired by SPT Offshore to coordinate the trial testing operations which included installation and subsequential removal of the suction pile in the Seagreen field.