Salvage of 2200Mt heavy crane barge Donna Paula

#emergencyresponse

After several hoisting beams collapsed, Marine Masters contributed to a successful jacking operation.

Read more

Refloated and
redelivered

December 4, 2021 — Several hoisting beams of the Syncrolift collapsed during lifting operations of the 2200Mt heavy crane barge Donna Paula, in an attempt to place her on the quay side of Lavgan Shipyard (India) for dry docking operations.

Marine Masters joined forces with Fagioli and executed a successful jacking operation, using a system of synchronized strand jacks. The crane barge was safely stabilized and lowered after which she was completely refloated and redelivered along the quayside. The project was executed within the time schedule and to the full satisfaction of the client.