Salvage of 2200Mt heavy crane barge Donna Paula
#emergencyresponse
After several hoisting beams collapsed, Marine Masters contributed to a successful jacking operation.
Refloated and
redelivered
December 4, 2021 — Several hoisting beams of the Syncrolift collapsed during lifting operations of the 2200Mt heavy crane barge Donna Paula, in an attempt to place her on the quay side of Lavgan Shipyard (India) for dry docking operations.
Marine Masters joined forces with Fagioli and executed a successful jacking operation, using a system of synchronized strand jacks. The crane barge was safely stabilized and lowered after which she was completely refloated and redelivered along the quayside. The project was executed within the time schedule and to the full satisfaction of the client.